Powered by Cactus Consulting (SMC Pvt) Ltd

Supply of 100KVA Solar System/RO Plant/Furniture & Fixture/Desktop Computers

🏛 Sukkur IBA University
📍 Sindh
📅 Closes: 17 Aug 2026
🔖 Ref: Tender Proc/EPADS/0110
⬇ Download Tender Documents — From PKR 3,000/mo

Tender Details

Issuing Organisation Sukkur IBA University
Location Sindh
Published 28 Jul 2026
Closing Date 17 Aug 2026
Reference Tender Proc/EPADS/0110

Description / Scope of Work

Sukkur IBA University invites electronic bids through the EPADS portal for the supply and installation of a 100 kilowatt peak solar system valued at approximately Rs. 17 million. This is a single-stage, one-envelope procurement for IBA Community Colleges and Schools across Sindh province. The project aims to enhance renewable energy capacity at the university's educational facilities. Eligible firms must be registered with the Federal Board of Revenue for income tax and sales tax purposes and possess relevant technical experience in solar energy installations. The bid security requirement is Rs. 340,000, equivalent to 2 percent of the estimated project cost, to be submitted as a pay order in favor of Sukkur IBA University. Bidding documents are available for download from www.iba-suk.edu.pk and https://portalsindh.eprocure.gov.pk, and must be submitted electronically through EPADS only; manual submissions will not be accepted. Bids close on 17 August 2026 at 3:00 PM, with opening scheduled for 3:30 PM the same day. Interested bidders should contact Hari Lal Nathani, Additional Director Procurement, via email at hari@iba-suk.edu.pk or the main university office at 071-5644141 for clarifications.

For Bidders: Our Analysis PAKISTANTENDER INSIGHT

Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.

This is a turnkey solar installation tender for a 100 kilowatt system at a university in Sindh, with an estimated budget of Rs. 17 million. The procurement is technology-focused and likely requires demonstrated experience in photovoltaic systems, balance-of-system components, and grid integration. The use of EPADS-only submission suggests professional-grade tendering; manual bids are explicitly excluded. Execution is expected to complete before the 2026 academic year begins, implying a reasonably tight implementation timeline. Bidders must have current tax registration and should verify their capacity to meet installation and warranty obligations.

Who can bid: Bidders must be registered with the Federal Board of Revenue for income and sales tax, and must be experienced firms in solar energy systems. Typically, suppliers of renewable energy equipment are expected to hold manufacturer certifications or authorized dealer status. The notice does not specify a PEC category, suggesting this is open to qualified private sector vendors rather than construction-focused contractors.

KEY FACTS FROM THE NOTICE
Bid securityRs. 340,000 (2% of estimated cost)
Estimated scaleMedium
Contract typeOne-off
Documents required Bid Security (copy with financial proposal; original pay order before deadline) · Technical proposal · Financial proposal · Tax registration certificates
HA Analysis by PakistanTender Research · Reviewed by Hamza Ali, Cactus Consulting (SMC Pvt) Ltd · How we verify tenders · Report an error

Get Full Tender Documents

Subscribe to download tender documents, track deadlines, and receive daily alerts for tenders in your industry.

Register Now — From PKR 3,000/mo Ask on WhatsApp
Chat with us
⬇ Download Tender Documents — from PKR 3,000/mo