Powered by Cactus Consulting (SMC Pvt) Ltd
Open Tender Transmission Lines

Supply of Stay Rod Complete (57/27) by MEPCO

🏛 Multan Electric Power Company (MEPCO)
📍 Punjab
📅 Closes: 4 Aug 2026
🔖 Ref: 57/27
⬇ Download Tender Documents — From PKR 3,000/mo

Tender Details

Issuing Organisation Multan Electric Power Company (MEPCO)
Location Punjab
Category Transmission Lines
Published 21 Jul 2026
Closing Date 4 Aug 2026
Reference 57/27

Description / Scope of Work

Multan Electric Power Company (MEPCO) is inviting bids for the supply of Stay Rod Complete (57/27), a goods procurement under a single-stage, one-envelope national bidding process. The tender is issued by the Assistant Manager Procurement at MEPCO Complex, Wapda Colony, Khanewal Road, Multan City in Punjab Province. This is a standard goods procurement for electrical equipment components required for MEPCO's power distribution operations. The bidding process follows a national competitive procedure with evaluation on a single-envelope basis, meaning both technical and financial proposals are submitted together for concurrent evaluation.

Bidders must meet the eligibility criteria as specified in the tender document, which includes requirements for registration, financial standing, and technical capability to supply the specified equipment. A bid securing declaration is required from all participating bidders to ensure serious participation and protect against frivolous bids. The bid security mechanism is detailed in the special conditions of contract and must be submitted as part of the bid envelope.

Bid documents are available for download from the tender portal and can be obtained from the office of the Assistant Manager Procurement at MEPCO Complex. Bids must be submitted in a single sealed envelope by the closing date of August 4, 2026. The bid opening will follow immediately after the submission deadline. Prospective bidders are advised to contact the Procurement Department at +92-319-975-7793 or amproc&dist@mepco.com.pk for clarifications, technical specifications, or assistance with the bidding process.

For Bidders: Our Analysis PAKISTANTENDER INSIGHT

Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.

MEPCO seeks a single-supplier contract for Stay Rod Complete components, standard electrical fittings for power distribution networks. The tender uses simplified single-envelope bidding, reducing administrative complexity. No framework or annual rate-contract language is evident, suggesting a one-time or spot purchase. Bidders should verify exact technical specifications and material standards required, as these are critical for electrical equipment compliance in power distribution. The Multan-based buyer is a provincial utility, indicating familiarity with supplier timelines and installation protocols.

Who can bid: Bidders typically require business registration (SECP or equivalent), valid NTN, and relevant industry experience in electrical equipment supply. PEC registration may be required if services include installation. No specific restrictions are stated, but suppliers should hold standards certifications for electrical goods (IEC or equivalent). Verification of capability to deliver on time is essential.

KEY FACTS FROM THE NOTICE
Estimated scaleSmall
Contract typeOne-off
HA Analysis by PakistanTender Research · Reviewed by Hamza Ali, Cactus Consulting (SMC Pvt) Ltd · How we verify tenders · Report an error

Explore More Tenders

Get Full Tender Documents

Subscribe to download tender documents, track deadlines, and receive daily alerts for tenders in your industry.

Register Now — From PKR 3,000/mo Ask on WhatsApp
Chat with us
⬇ Download Tender Documents — from PKR 3,000/mo