Powered by Cactus Consulting (SMC Pvt) Ltd Mon–Sat 10am–10pm+92 311 1687701
PakistanTender PakistanTender
Category guide

Energy Meter and Flow Meter Tenders in Pakistan

Meter tenders cover the devices utilities use to measure what customers consume and what moves through their networks. Energy meters measure electricity in single phase, three phase and high tension installations, and increasingly in smart or prepaid form. Flow meters measure gas, water, steam, oil and other fluids in pipes and are used both for billing and for process control in industry.

Tenders collected to date
70
Added in the last 30 days
9
Open for bids right now
4
From outside e-PADS (90 days)
84%
Where these tenders come from

Last 90 days, energy & flow meters tenders

Buyers' own notices (SOEs, universities, hospitals, defence)24
Provincial authorities (Punjab, KPPRA, SPPRA, BPPRA)6
Newspapers1
e-PADS and federal PPRA6
2-minute demo

See the portal and the daily email

424Newspaper notices
25NGO tenders
326Private-sector tenders
44World Bank notices
48UN agency tenders

Across PakistanTender in the last 90 days — sources most firms never check.

Latest open energy & flow meters tenders

See all on search →

What energy & flow meters tenders cover

The largest buyers are the electricity distribution companies, the National Transmission and Despatch Company, gas utilities, water and sanitation agencies, refineries, fertiliser plants and power producers. Losses and billing accuracy are major concerns for distribution companies, so they procure meters in large lots and often change the specification in line with new technology such as smart metering and remote reading.

The category suits importers, local assemblers and manufacturers with test reports and agency authorisation. Bids are decided largely on technical compliance, so documentation and approvals matter more than a lower price on a product that does not meet the specification. Quantities in a single distribution company notice can run into many thousands of units, so manufacturing capacity and a credible delivery plan are scored alongside the test results, and some buyers ask for a factory visit before award.

  • Single phase and three phase static energy meters
  • Smart meters with communication modules and prepaid meters
  • High tension and bulk supply meters with current and voltage transformers
  • Meter boxes, seals, cables and installation accessories
  • Gas diaphragm and turbine meters and pressure regulators
  • Water meters for domestic, commercial and bulk use
  • Ultrasonic, electromagnetic and orifice flow meters for industry
  • Calibration, testing and meter reading systems

Who issues them

Electricity distribution companies such as LESCO, FESCO, IESCO, GEPCO, MEPCO, PESCO, HESCO, SEPCO, QESCO and K-Electric lead energy meter buying. SNGPL and SSGC buy gas meters. Water and sanitation agencies, WASA bodies and city water boards buy water meters, while process industries and oil and gas operators buy flow meters for plants and pipelines.

Rules and procedure

Public distribution and gas companies follow the Public Procurement Rules, 2004 or their own approved procedures and publish through e-PADS and newspapers. Meters are generally bought through open competitive bidding in two envelopes, with a bid security of a few percent. Technical evaluation checks the type, accuracy class and relevant standards, such as IEC specifications for electricity meters, and bidders submit type test reports from an accredited laboratory. Local authorities such as NEPRA set requirements for utility metering, and meter makers may need to be on the utility's approved vendors list. Samples are usually tested at the buyer's laboratory before the bid is accepted, and the contract includes a warranty and replacement for defective units, with deliveries in lots against inspection. Payment is typically made in proportion to each accepted lot, with a retention or performance guarantee covering the warranty period, which is commonly one to several years. Tamper resistance has become a priority, so notices often ask for anti-tamper features, event logging and sealed terminal covers, and they may require meters to carry the utility's own markings and serial number format.

How to bid

  1. Get registered for NTN and sales tax, and check whether the utility maintains an approved vendors list for meters.
  2. Compare the bid specification with your product: accuracy class, communication protocol, display, tamper detection and sealing.
  3. Collect type test reports, manufacturer authorisation and quality certificates for the exact model offered.
  4. Price per unit delivered including taxes, with warranty, and arrange bid security and samples.
  5. Plan the delivery lots, pre-shipment inspection and storage so you can meet the schedule.

Documents you will usually need

  • NTN certificate and sales tax registration
  • Manufacturer authorisation or agency agreement
  • Type test reports from an accredited laboratory
  • ISO 9001 or other quality management certificates
  • Approved vendor registration with the utility where applicable
  • Past supply orders and performance certificates

Tips from the notices we track

  • Submit complete test reports for the exact model, since an incomplete file is the quickest route to technical rejection.
  • If you offer smart meters, document the communication method, data format and back-end system integration clearly.
  • Allow for the testing and rejection rate in your planning, because failed lots delay payment.

Frequently asked questions

What kinds of meters are tendered?

Mainly electricity energy meters, gas meters, water meters and industrial flow meters, along with accessories, seals and testing equipment.

Do I need to be an approved vendor?

Many utilities keep an approved vendors list for meters and expect bidders to be on it or to qualify through sample testing. Check the notice for the exact requirement.

Are smart meter tenders different?

They add requirements for communication, data management and software integration. Some are supply only, while others include installation and a metering data system.

Is PEC registration required?

Not for pure supply. If the contract includes installation works of a size covered by PEC rules, the notice may require it.

Where can I see new meter tenders?

They are published on e-PADS, utility websites and newspapers. PakistanTender collects them into one list and emails new ones daily in the categories you select.

Your plan

General Order / Contractor

For a general order supplier or a single contractor.

PKR 3,000 / month
or PKR 29,000 a year — 2 months free
  • 1 login
  • Daily email alerts for your categories
  • Portal search and notice files
  • WhatsApp support
Supply categories such as: Office & IT supplyGeneral Order · Stationery · Furniture · IT Equipment · Printing · Diaries & CalendarsFacilities & servicesCleaning Items · Janitorial · Security Guard · Catering · Uniform · Courier ServiceEquipment & vehiclesSafety Equipment · Security Equipment & CCTV · Kitchen Equipment · Vehicle Spare Parts · Tyres · Oil & Lubricants

No auto-renewal. Pay by bank transfer; your logins are set up the same working day.

Get this week's tenders by email — free

Tell us who you are and we'll email live energy & flow meters tenders today. No card, no commitment.

Prefer to talk? WhatsApp us or call +92 311 1687701.

Stop checking ten portals and three newspapers every morning.

Chat with us