Powered by Cactus Consulting (SMC Pvt) Ltd
Open Tender Transmission Lines

Construction of 500kV Double Circuit Transmission Line by National Grid Company Pakistan

🏛 National Grid Company of Pakistan
📍 Punjab
📅 Closes: 21 Aug 2026
🔖 Ref: TLC-18(R)-2026
⬇ Download Tender Documents — From PKR 3,000/mo

Tender Details

Issuing Organisation National Grid Company of Pakistan
Location Punjab
Category Transmission Lines
Published 7 Aug 2026
Closing Date 21 Aug 2026
Reference TLC-18(R)-2026

Description / Scope of Work

National Grid Company of Pakistan invites sealed bids for construction and completion of civil works, erection, stringing, testing and commissioning of a 500kV Double Circuit Quad Bundle Transmission Line from Tower No. 01 Near Sangal to Tower No. 69 Near Potha Sharif, spanning 23.5 kilometers in Punjab. The project uses ACSR Bunting conductor and forms Lot-I of the broader transmission line development from Sangal to the 500kV Maira Switching Station. This is a substantial infrastructure contract executed through NGC's own resources under National Competitive Bidding procedures as per PEC Single Stage-Two Envelope methodology. Bidding Documents are available from the office of Chief Engineer (MP&M) at NGC's Shaheen Complex in Lahore upon payment of a non-refundable fee of PKR 5,000 via bank draft.

Eligible bidders must be licensed by the Pakistan Engineering Council in the appropriate category. Main contractors and joint venture partners must have substantially completed at least one 500kV or higher voltage transmission line (or three 220kV or higher bundled lines) of minimum 11.75 kilometers strung by controlled tension method within the last ten years, with at least two years of successful operation prior to the bid deadline. For joint ventures, the lead partner must meet primary criteria while other partners must demonstrate completion of 220kV or higher voltage lines of at least 5.875 kilometers. Bidders must possess their own tension and stringing equipment with associated tools and critical spares, supported by documentary evidence, catalogues and drawings in good working condition, or provide confirmed sourcing agreements with guarantees to procure such equipment prior to stringing commencement. All bids require bid security as specified in Bidding Data, typically in the form of a bank guarantee from a scheduled bank in Pakistan.

Bidding documents can be obtained from Chief Engineer (MP&M), NGC, 8th Floor, Shaheen Complex, Egerton Road, Lahore, by telephone 92-42-99202597, fax 92-42-99202173, or email cempm@ntdc.com.pk. The Pre-Bid meeting will be held on June 15, 2026 at 11:00 am. Sealed bids must be submitted on or before July 1, 2026 at 11:00 am and will be opened at 11:30 am the same day at the above office in the presence of interested bidder representatives. NGC reserves all rights regarding bid rejection as per PPRA Rules 2004.

For Bidders: Our Analysis PAKISTANTENDER INSIGHT

Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.

This is a 23.5-km high-voltage transmission line construction package requiring substantial prior experience in 500kV or equivalent voltage stringing using controlled tension methods. The tight timeline (bid submission July 1, 2026) and specialized equipment requirements (own or pre-arranged tension/stringing rigs) limit competition to established players with documented track records and equipment inventory. The project involves substantial civil works, tower erection, and stringing in Punjab with demonstrated two-year operational history required from prior comparable work. This is a one-off contract awarded to a single entity or approved joint venture structure.

Who can bid: Bidders must be licensed by Pakistan Engineering Council in appropriate construction category. Lead contractor or JV lead must have completed one 500kV-or-higher (or three 220kV-or-higher bundled) transmission line of minimum 11.75 km within ten years with two-year operational history. Other JV partners must show 220kV-or-higher experience of minimum 5.875 km. Documentary evidence includes notarized completion and defects liability certificates. Piling experience (normal or river crossing) within five years is mandatory.

KEY FACTS FROM THE NOTICE
Bid securityamount specified in Bidding Data not stated in this excerpt
Pre-bid meetingJune 15, 2026 at 11:00 am, Shaheen Complex Lahore
Estimated scaleLarge
Contract typeOne-off
Documents required Contract agreement copies with English translation · Substantial completion certificates (notarized) · Defects Liability Certificate (notarized) · Documentary evidence of tension/stringing equipment (catalogues, drawings, or sourcing agreements with guarantees) · Evidence of piling experience in last five years
HA Analysis by PakistanTender Research · Reviewed by Hamza Ali, Cactus Consulting (SMC Pvt) Ltd · How we verify tenders · Report an error

Explore More Tenders

Get Full Tender Documents

Subscribe to download tender documents, track deadlines, and receive daily alerts for tenders in your industry.

Register Now — From PKR 3,000/mo Ask on WhatsApp
Chat with us
⬇ Download Tender Documents — from PKR 3,000/mo