Tender Details
Description / Scope of Work
This bid schedule invites offers for the rehabilitation and improvement of street through provision of asphalt, bricktile, tufftile, PCC, sewerage and water supply infrastructure in UC-32, NA-118, Lahore. The project includes missing slabs and raising of manholes across the locality. The estimated cost of the work is Rs 17,250,675 plus 5% PST, totaling Rs 18,113,210. The earnest money required is Rs 905,661 and the completion period is three months. The scope encompasses regular excavation, dismantling of existing PCC, embankment construction with borrow earth, sub-base stone course provision, marble strip installation for mosaic flooring division, cement concrete plain laying, manhole raising with CI rings, gully grating chambers, open drain construction, road metalling dismantling, base course of crushed stone aggregate, brick edging, bituminous priming coat, plant premixed bituminous carpet, traffic lane marking painting, tuff paver installation, brick tile laying, building foundation excavation, mulba removal, reinforced cement concrete work, mild steel reinforcement fabrication, and provision of water supply and sewerage pipes with earth work in open cutting. The project is located in Lahore, Punjab and represents medium-scale municipal infrastructure development combining road rehabilitation with essential utility services.
Bidders must possess valid contractor registration and appropriate licensing as typically required for civil construction projects of this scale. Proof of PEC registration or equivalent authority approval, valid tax registration (NTN), and evidence of financial capacity and past performance on similar municipal works are typically mandated. The specific eligibility criteria, bid security percentage or amount, and required documentation should be verified from the detailed bid documents, which will clarify any restrictions on bidder nationality, joint venture requirements, or technical qualifications.
Bid documents can be obtained from the issuing authority's office in Lahore during working hours. Sealed bids must be submitted by the closing date specified, with technical and financial components typically evaluated separately. The bid opening ceremony will be conducted at the authority's designated office location. Interested bidders should contact the Chief Engineer, LDA or the specified project officer for clarification on bid document acquisition, submission procedures, and any pre-bid meetings. All communications and submissions must follow the format and timeline prescribed in the bid schedule.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
This is a three-month municipal infrastructure contract in Lahore combining street rehabilitation (excavation, embankment, concrete, asphalt, tiling) with water supply and sewerage piping.
Estimated cost Rs 17.25 million plus tax suggests moderate contract scale. The scope is comprehensive and repetitive work-intensive (6000+ cubic feet excavation, 6700+ sq ft paving, 3600+ running feet piping), making economies of scale and labour availability critical. No unusual technical barriers but tight timeline and broad scope require experienced execution teams with access to adequate equipment and trained workforce.
Who can bid: Bidders typically require valid PEC registration (or equivalent provincial contractor licensing), NTN and valid tax registration, and demonstrated experience on municipal civil works. Financial capacity and past performance on similar road and utility projects typically mandatory. Joint ventures may be permitted. Specific restrictions on bidder eligibility, if any, must be confirmed in the full bid documents.