Pakistan State Oil Company Limited invites quotations for fabrication and installation of car and bike parking sheds at its new depot facility in Faisalabad, Sindh. The scope of work includes mechanical fabrication of three parking structures (two car parking sheds measuring 50 ft × 18 ft and 18 ft × 18 ft, and one bike parking shed measuring 20 ft × 18 ft, each 12 ft high) using PVC tensile fabric structures with M.S. pipe frames, base plates, and complete painting in PSO-approved colours. Civil works comprise excavation of 25 cubic meters and laying of 9 cubic meters of PCC 1:4:8 concrete. The project is valued at approximately 1,584 square feet of labour services under the mechanical component, with reference SAP number 6100018284.
Eligible bidders must provide skilled manpower and demonstrate capacity to deliver materials within two to three weeks of purchase order issuance. The contractor must arrange transportation and meals for workers, arrange site surveys to confirm specifications, obtain autocad design approval within three to four days, and ensure all staff are fully vaccinated against COVID. The contractor bears full responsibility for worker safety, accident compensation, and defect rectification during the execution period. Subletting is prohibited without prior PSO approval.
Quotations must be submitted by 1 October 2026. The contractor is required to complete supply and installation within 45 working days and provide one year warranty with free maintenance and material replacement for any defects. Bid documents are available from PSO House, Khayaban-e-Iqbal, Clifton, Karachi, and queries may be directed to the contact details provided. Contractors must survey the site and confirm all specifications and design details with the PSO site engineer before placing their orders.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
PSO requires a contractor with experience in fabricated steel structures and tensile fabric installations for three mid-scale parking sheds in Faisalabad.
The 45-day delivery and installation deadline is moderately tight; the mechanical work involves precision pipe fabrication and on-site assembly with specific gauge requirements and custom sizing. Civil groundwork (excavation and concrete) is relatively minor. The one-year warranty obligation and PSO's design approval process suggest this is a quality-sensitive project. Competitive bidders should have structural welding capability, tensile fabric sourcing arrangements, and proven site management experience.
Who can bid: The notice does not explicitly state PEC category or SECP/NTN registration requirements. Typically, contractors for fabrication and civil works in Pakistan are required to hold valid PEC registration (category G-III or higher for structural steelwork), current NTN and sales tax registration, and may require ISO 9001 or equivalent quality certification. Compliance with PSO's vendor approval process is implied.