Tender Details
Description / Scope of Work
The Punjab Government Servants Housing Foundation (PGSHF) is inviting sealed tenders for the supply of a complete winching machine set intended for de-silting and cleaning of choked sewer lines at the Punjab Government Servants Housing Scheme in Faisalabad, Punjab. The approximate cost of this procurement is PKR 2,100,000.00, with a project completion period of one month, though the time limit clause indicates six months as an extended deadline. This is a straightforward supply contract for specialized sewerage maintenance equipment required to address drainage system blockages within the housing scheme.
Bidders must submit earnest money equivalent to five percent of the estimated cost as bid security. The tender documents require contractors to ensure all specifications and quality standards are met, with inspection of the site strongly recommended prior to bid submission. Contractors must be capable of supplying equipment that meets the defined technical requirements for sewer de-silting operations, and all costs including taxes, duties, and statutory obligations must be incorporated into the quoted price.
Tender documents are available for purchase from the issuing authority, and bids must be submitted in sealed envelopes on or before the closing date. The tender will be opened as per the single stage-two envelope procedure. Interested suppliers should contact the PGSHF project office in Faisalabad for complete bid documents, clarifications, and submission instructions. Successful bidders will be notified following evaluation and must sign a formal contract agreement before commencing work.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender, written with AI from the official notice and checked by our quality rules — not part of the official notice. Always confirm details against the original tender document.
This is a straightforward supply tender for specialized sewerage maintenance equipment—a winching machine set for de-silting operations—valued at PKR 2.1 million.
The scope is limited to equipment supply rather than installation or ongoing services. The time limit discrepancy (one month vs six months) suggests potential execution flexibility. Bidders should verify whether the equipment must comply with specific Pakistani sewerage standards and whether after-sales support or warranty is expected, as these details are not explicit in the notice.
Who can bid: The notice does not specify registration requirements. Typically, suppliers of mechanical equipment in Pakistan should hold valid SECP registration or NTN, and relevant trade licenses. Vendors with experience in water and sanitation equipment supply are preferred. Check whether PGSHF requires PEC registration or specific certification for sewerage equipment.