Tender Details
Description / Scope of Work
Pakistan Airports Authority (PAA) is inviting bids for the rehabilitation and renovation of finance offices at Block-3 of Islamabad International Airport (IIAP) located in Islamabad, Islamabad Capital Territory. This is a works contract procured under the National Single Stage-One Envelope bidding method. The project involves comprehensive renovation and rehabilitation works to restore and upgrade the finance office facilities at the airport complex. The contract is advertised by the Deputy Director of the Landside Division, PAA, and is open to qualified national contractors meeting the specified eligibility criteria.
Bidders must satisfy eligibility requirements as outlined in the Bid Data Sheet (BDS) and Eligibility Criteria section of this Standard Bidding Document. Prospective bidders are required to submit all mandatory documents including technical qualifications, financial capability, and registration credentials from relevant authorities. A bid securing declaration or bid security in the amount specified in the BDS must accompany each bid submission. Bidders are also required to sign an Integrity Pact and provide a performance guarantee form as part of their bid package.
Detailed bid documents, including the Bill of Quantities (BOQ), scope of work, price schedule, general and special conditions of contract, and procurement forms, are available in this Standard Bidding Document. Bids must be submitted in a single envelope containing all required documentation. The bid opening will be conducted on the date specified in the BDS. For further information, clarifications, or to obtain bid documents, interested bidders should contact Muhammad Suleman, Deputy Director Landside Division, Islamabad International Airport, Islamabad, by phone at +92-315-983-2148 or email at muhammadsuleman@paa.gov.pk.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender, written with AI from the official notice and checked by our quality rules — not part of the official notice. Always confirm details against the original tender document.
PAA seeks qualified contractors for comprehensive rehabilitation and renovation of Finance Offices Block-3 at Islamabad International Airport.
This is a medium-to-large infrastructure upgrade project with extended closure (Oct 2026), suggesting phased execution within airport operational constraints. Single-stage bidding reduces timeline pressure but demands complete technical and financial documentation upfront. Airport renovation work typically involves coordination with ongoing operations and stringent safety/compliance requirements—factor in potential access restrictions and regulatory approvals.
Who can bid: Typically requires PEC registration (Category A/B for building renovation works), active NTN, and SECP registration if applicable. Bidders must demonstrate technical qualifications, financial capability, and valid registration credentials as per BDS criteria. Integrity Pact signature and performance guarantee submission mandatory. Specific category/threshold not stated in summary; refer to full BDS.