The submission deadline has passed. The page is kept for reference. View active tenders →
Tender Details
Description / Scope of Work
The Lahore Electric Supply Company Limited (LESCO) invites bids for maintenance of the distribution system for the Eastern Circle during the fiscal year 2026-27 under Tender No 3.3. This comprehensive works contract involves replacement of high tension and low tension jumpers of lines, distribution transformers, bus bars, and broken disc or pin insulators, as well as tree trimming services across the Eastern Circle area in Lahore, Punjab. The tender is issued by the Chief Engineer O&M Distribution at LESCO's office located at 22-A Queens Road, Lahore, and follows a national single-stage one-envelope bidding procedure.
Bidders must meet the specified eligibility criteria as outlined in the tender document, which includes requirements for financial capacity, technical qualifications, and relevant experience in distribution system maintenance works. Interested contractors are required to submit a bid securing declaration along with their bids. All bidding documents must comply with the general and special conditions of contract, and participants must execute an integrity pact as a prerequisite for participation.
Bid documents are available from LESCO's Chief Engineer O&M Distribution office. Bids must be submitted to the same office by the official deadline of July 28, 2026. Detailed scope of work, price schedules, work specifications, market rates, and all contract forms including performance guarantee requirements are provided in the standard bidding document. Prospective bidders should contact the office via phone at +92-370-499-0416 or email dm.osmdist@lesco.gov.pk for any clarifications regarding this tender for distribution system maintenance in Lahore.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
LESCO seeks a contractor for one fiscal year (2026-27) of scheduled maintenance across Eastern Circle Lahore—H.T./L.T.
jumper replacement, transformer swaps, bus bar work, insulator repairs, and tree trimming. This is recurring cyclical work rather than one-off, suggesting stable revenue if awarded. Scale appears medium-to-large given area coverage and component volumes. Tight closure (July 28, 2026) leaves limited bidding window. Integrity pact requirement signals stricter governance than typical SME contracts.
Who can bid: Typically requires contractor registration with PEC (Category likely C or B for electrical distribution), active NTN/SECP registration, and demonstrated experience in power distribution maintenance. Specific financial capacity and technical qualifications thresholds stated in full tender document but not disclosed here. Integrity pact execution is mandatory.