Powered by Cactus Consulting (SMC Pvt) Ltd
Open Tender Renovation

School Building Construction and Upgradation Works by Education Works Division Matiari

🏛 Office of the Executive Engineer, Education Works Division, Matiari
📍 Sindh
📅 Closes: 13 Aug 2026
🔖 Ref: XEN(EWD)/TC/757
⬇ Download Tender Documents — From PKR 3,000/mo

Tender Details

Issuing Organisation Office of the Executive Engineer, Education Works Division, Matiari
Location Sindh
Category Renovation
Published 31 Jul 2026
Closing Date 13 Aug 2026
Reference XEN(EWD)/TC/757

Description / Scope of Work

The Office of the Executive Engineer, Education Works Division at Government Boys Degree College Matiari invites sealed bids for three school infrastructure projects in Sindh with a combined estimated cost of Rs 8.934 million. The works include construction and reconstruction of twelve existing primary and elementary schools at GGPS Mulan Sawani (remaining work, ADP 338 of 2026-27), upgradation of one high school to higher secondary level at GBHSS Bhanoth (compound wall, ADP 564 of 2026-27), and construction of a new building for Government Boys Higher Secondary School Saeed Khan Laghari (compound wall, ADP 583 of 2026-27). All projects are scheduled for twelve-month completion periods and are funded by Sindh Government.

Eligible bidders must be registered with Pakistan Engineering Council in CE-10 category for the financial year 2025-26, with average annual financial turnover not less than Rs 2.934 million in the last five years. Electrical contractor license holders issued by the Electric Inspector License Renewal 2026 for Mirpurkhas Region must participate. Active Federal Board of Revenue and Sindh Revenue Board registrations with NTN certificates and CNIC copies are mandatory. Bidders must provide evidence of similar works executed in the last five years with minimum 80% of estimated cost for one work or minimum 50% for two works of similar nature.

Bidding documents are available on the ePADS portal at https://portalsindh.eprocure.gov.pk from the date of this notice until 19 August 2026 at 12:00 AM. Technical and financial proposals must be submitted separately in sealed envelopes with NIT number and work details. Bids will be opened on 13 August 2026 at 12:00 AM at the office of the Executive Engineer, Education Works Division. Bid validity is ninety days. Bid security of Rs 3,000 per work must be submitted with financial proposals. Contact the office at 022-2760283 or xen.ewd.matiari@gmail.com for further information.

For Bidders: Our Analysis PAKISTANTENDER INSIGHT

Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.

Three school infrastructure projects totalling Rs 8.934 million: primary school reconstruction (12 units), high school upgradation, and boys secondary school building. All twelve-month contracts, modest scale individually but bundled scope. Requires PEC CE-10 registration and turnover of Rs 2.934 million minimum. Electrical contractor license mandatory for Mirpurkhas Region. Limited timeline for bid preparation (closure 13 August 2026) and submission. One-off government contracts typical of education sector ADP funding cycles.

Who can bid: Bidders must hold Pakistan Engineering Council CE-10 registration for 2025-26 with minimum average annual turnover of Rs 2.934 million in last five years. Electrical contractor license from Electric Inspector for Mirpurkhas Region required. Active FBR and SRB registration with NTN certificate and CNIC copies compulsory. Typically such works also require valid tax clearance certificates and no adverse performance history.

KEY FACTS FROM THE NOTICE
Bid securityRs 3,000 per work
Estimated scaleMedium
Contract typeOne-off
Documents required PEC registration certificate (CE-10, 2025-26) · Electrical contractor license (Mirpurkhas Region, 2026) · FBR active taxpayer list and NTN certificate · SRB registration certificate · CNIC of owner/proprietor · Affidavit (non-litigation, no abandonment, not blacklisted) · Evidence of similar works (80% or 50% rule documentation) · Technical proposal with machinery/equipment and staffing details
HA Analysis by PakistanTender Research · Reviewed by Hamza Ali, Cactus Consulting (SMC Pvt) Ltd · How we verify tenders · Report an error

Explore More Tenders

Get Full Tender Documents

Subscribe to download tender documents, track deadlines, and receive daily alerts for tenders in your industry.

Register Now — From PKR 3,000/mo Ask on WhatsApp
Chat with us
⬇ Download Tender Documents — from PKR 3,000/mo