Tender Details
Description / Scope of Work
Sukkur Power Electric Company (SEPCO) invites national competitive bids for the procurement of Breather for Power Transformer Tank and Breather for Tap Changer under tender reference NCB-S-30/2026. This is a goods procurement conducted through single-stage, one-envelope bidding methodology. The project is being managed by the Chief Engineer (Development) PMU SEPCO Sukkur, located at 2nd Floor, Al Sehra Building, Minara Road, near Session Court in Sukkur, Sindh Province. The procurement aims to secure essential components for power transformer maintenance and operational efficiency within the SEPCO service territory.
Eligibility criteria require bidders to demonstrate technical and financial capacity commensurate with the procurement scope. Bidders must submit completed procurement forms including past experience and completed contracts, historical contract non-performance records, current contracts and progress reports, financial capacity and net worth evaluation, and average annual turnover documentation. A bid securing declaration is mandatory. The evaluation will follow the criteria outlined in the bid data sheet, with preference given to bidders with relevant experience in supplying transformer components.
Interested bidders can obtain complete bidding documents from the office of the Chief Engineer (Development) PMU SEPCO Sukkur. Bids must be submitted in a single envelope format as per the specified procedure. The bidding document contains general and special conditions of contract, performance guarantee requirements, and an integrity pact that all bidders must sign. Contact Chief Engineer (Development) at zain.chandio@sepco.com.pk or phone +92-313-344-9546 for further information regarding bid submission, timeline, and technical specifications.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
SEPCO is procuring transformer breathers—routine maintenance components for power system assets.
The tender follows national competitive bidding (NCB) rules with single-stage submission, suggesting straightforward technical requirements and likely modest contract value typical of component procurement. Bidders must demonstrate prior experience with transformer equipment and sound financial standing. The September 2026 closure date implies moderate preparation time. This appears a one-off component replenishment rather than a framework arrangement, making it suitable for established electrical equipment suppliers with documented track record.
Who can bid: Bidders must typically be registered with relevant national authorities (SECP/NTN for companies, PEC for engineering firms if applicable) and possess documented experience in supplying power system components. Financial statements and net worth documentation are required. The notice does not explicitly restrict participation to Pakistani nationals, but procurement policy typically reserves national competitive bids for local and international firms meeting SEPCO's vendor qualification standards.