Open Tender Transformer

LV Bushing Procurement for 10/13MVA Power Transformer by SEPCO Sukkur

🏛 Sukkur Power Electric Company (SEPCO)
📍 Sindh
📅 Closes: 30 Sep 2026
🔖 Ref: NCB-S29/2026
⬇ Download Tender

Tender Details

Issuing Organisation Sukkur Power Electric Company (SEPCO)
Location Sindh
Category Transformer
Published 15 Sep 2026
Closing Date 30 Sep 2026
Reference NCB-S29/2026

Description / Scope of Work

Sukkur Power Electric Company (SEPCO) invites bids for the procurement of Low Voltage (LV) bushings for 10/13MVA power transformers under National Competitive Bidding (NCB). This is a goods procurement managed by the Chief Engineer (Development) at PMU SEPCO Sukkur, located in Sindh province. The tender is issued as a single-stage, one-envelope bidding process with reference NCB-S29/2026. The scope includes supply of LV bushings meeting specified technical requirements for power transformer application. Bidders are required to review the detailed specifications and related services outlined in the bidding document to ensure their products conform to all technical and quality standards.

Eligibility for participation requires bidders to meet general financial and technical capacity criteria. Bid security is mandated as per the Bid Data Sheet provisions. Bidders must provide evidence of past experience and completed contracts of similar nature, along with documentation of financial capacity and average annual turnover. All participants must comply with integrity pact requirements and submit a performance guarantee form upon contract award. Bidders must also disclose any historical contract non-performance, pending litigation, or litigation history affecting their eligibility.

Bid documents are available from the PMU SEPCO office at 2nd Floor, Al Sehra Building, Minara Road, near Session Court, Sukkur, Sindh, Pakistan. Sealed bids must be submitted before the closing date of September 30, 2026. Bids will be opened on the same date at the SEPCO office. All inquiries and clarifications should be directed to the Chief Engineer (Development) via phone +92-313-344-9546 or email zain.chandio@sepco.com.pk.

🔒
Subscribe to read 2 more paragraphs of scope, requirements and submission detail
Full scope, eligibility, bid security, deadlines and downloadable tender documents — plus daily alerts for matching tenders. From PKR 3,000/month.
Unlock →

For Bidders: Our Analysis PAKISTANTENDER INSIGHT

Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.

SEPCO seeks LV bushings for 10/13MVA transformers via single-stage national competitive bidding.

This is a goods-only contract, likely modest in value, requiring standard transformer component supply with no installation. Bidders must demonstrate prior experience supplying similar electrical components and meet financial thresholds. The September 2026 deadline allows reasonable preparation time. No pre-bid meeting is noted, suggesting straightforward technical specifications. Participation restricted to entities with documented past performance in comparable transformer equipment procurement.

Who can bid: Bidders must typically be registered with SECP (if private company) or relevant authority, hold valid NTN, and possess PEC registration if undertaking any related works. Past performance in power equipment supply is required. Financial statements demonstrating net worth and average annual turnover must be submitted. Bid security and performance guarantee will be required. Integrity pact compliance is mandatory.

🔒
Subscribe to read our full eligibility read and bidder analysis
Full scope, eligibility, bid security, deadlines and downloadable tender documents — plus daily alerts for matching tenders. From PKR 3,000/month.
Unlock →
KEY FACTS FROM THE NOTICE
Estimated scaleSmall
Contract typeOne-off
Documents required Past Experience and Completed Contracts · Historical Contract Non-Performance and Litigation History · Current Contracts and Their Progress · Financial Capacity and Net Worth Evaluation Form · Average Annual Turnover documentation · Bid Securing Declaration · Integrity Pact · Performance Guarantee Form
HA Analysis by PakistanTender Research · Reviewed by Hamza Ali, Cactus Consulting (SMC Pvt) Ltd · How we verify tenders · Report an error

Explore More Tenders

Get Full Tender Documents

Subscribe to download tender documents, track deadlines, and receive daily alerts for tenders in your industry.

Register Now — From PKR 3,000/mo Ask on WhatsApp
Chat with us
⬇ Download Tender