Tender Details
Description / Scope of Work
This is Addendum No. 1 to a tender for supply, installation, replacement and maintenance of electrical systems, solar photovoltaic (PV) systems and associated equipment across the Lahore Metrobus transit network from Shahdra to Gajju Matta at designated stations throughout Lahore, Punjab. The scope encompasses high voltage cables, transformers, earthing systems, station lighting, station fans, solar energy systems and emergency fault rectification services. The addendum modifies key terms of the original bidding document including reduction of certain material quantities and clarification of service provider responsibilities for equipment repair and replacement procedures.
Bidders must meet standard eligibility criteria for electrical and renewable energy service providers, typically requiring PEC registration for engineering firms, NTN and valid business registration. Bid security and technical qualification thresholds are specified in the original bidding documents now amended by this addendum. The services component quoted value shall not exceed 35 percent of total estimated cost per revised Bid Data Sheet Clause 15.
Bid documents are available as per the original tender notice. Bidders must submit sealed bids by the advertised closing date. Key amendments include deletion of specific sub-items from earthing system, station lights, station fans and solar energy system price tables, reduction of high voltage cable accessories quantity from 500 to 200 units, and revised scope clarification for emergency fault location and rectification requiring client approval before equipment removal and at service provider's cost for transportation to designated client storage.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
This addendum to an established metrobus electrical maintenance tender tightens service cost limits to 35% of total contract value and reduces quantities for several material categories, particularly …
igh voltage cable accessories (500 to 200 units). The scope emphasizes emergency fault response with strict client approval protocols and bidder responsibility for faulty equipment transportation. Scope amendments clarify repair versus replacement decision-making and require detailed undertakings when repair is impossible. The recurring nature and multi-station geographic spread suggest a significant ongoing maintenance contract, but quantity reductions indicate potential budget constraints or scope refinement.
Who can bid: Typically required: PEC registration for electrical engineering contractors, valid NTN and business registration with SECP, proof of technical competence in electrical and solar systems, and relevant experience on transport infrastructure projects. The notice does not explicitly state eligibility thresholds; check original bidding document for detailed requirements.