Tender Details
Description / Scope of Work
The National Highway Authority, Ministry of Communications, invites pre-qualification documents for the construction of Kach Harnai Sanjavi Road Package-II, spanning from kilometre 0+000 to kilometre 55+834, covering a total length of 55.834 kilometres in the Federal province of Pakistan. This major road infrastructure project represents a significant investment in Pakistan's national highway network and is being tendered through the e-Bidding System to ensure transparency and competitive procurement in accordance with anti-corruption standards. The project scope encompasses the complete construction of this critical transport corridor connecting Harnai and Sanjavi regions.
Eligibility requirements typically mandate that bidders must be registered with the Pakistan Engineering Council (PEC) in relevant categories for road construction works, hold valid National Tax Numbers (NTN), and possess satisfactory financial standing and technical capacity. Bidders must submit evidence of prior experience in similar road construction projects of substantial scale and demonstrate organisational capability to execute works of this magnitude. Specific bid security amounts and detailed pre-qualification criteria are contained within the full pre-qualification documents issued by the National Highway Authority.
Pre-qualification documents are available from the Procurement and Contract Administration Section of the National Highway Authority located at 28-Mauve Area, Sector G-9/1, Islamabad, Pakistan (telephone: 92-51-9032727). Interested contractors should obtain the complete tender documents and submission instructions from this office. All bids must be submitted electronically through the designated e-Bidding System portal in accordance with the tender schedule and procedural requirements specified in the bid documents.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
A pre-qualification stage for construction of a major 55.834 km national highway connecting Harnai and Sanjavi in Federal Pakistan.
This is large-scale infrastructure work requiring PEC registration and substantial prior experience. The closing date of October 2026 suggests extended evaluation timelines. This is a single-phase project, not recurring. Contractors must demonstrate significant financial capacity and track record in highway projects of comparable length. Competition is likely intense given the project scale and national importance.
Who can bid: Bidders typically require PEC category C or higher registration for road construction, valid NTN, and corporate status (SECP registered if private). Evidence of net worth, liquid assets, and completion of similar-scale road projects (preferably 40+ km) is typically required. No restrictions on foreign participation are stated in the pre-qualification notice.