Description / Scope of Work
The Lahore Electric Supply Company (Material Management) invites sealed bids from eligible bidders for the procurement of HT Steel Structures Size 45' Galvanized goods under Tender No. 4465 with reference P157212. This procurement is planned for the financial year 2026-27 and covers the supply of galvanized high-tension steel structures of 45-foot size. The bidding process will be conducted through the e-Pak Acquisition and Disposal System (ePADS v2.0) using a Single Stage-One Envelope methodology with Least Cost Based Selection (LCBS) technique in accordance with Public Procurement Rules 2026.
All eligible bidders must submit bids accompanied by bid security in the form of a Pay Order, Banker's Cheque, Call Deposit, Bank Guarantee, Demand Draft, or alternatively a bid securing declaration in the format specified in the bidding documents. Bidders are required to be registered on ePADS v2.0 to participate in the procurement process. The complete e-bidding documents containing detailed terms, conditions, specifications and requirements are available on the ePADS portal at https://epads.gov.pk/opportunities/federal/procurements/157212.
Bids must be submitted through ePADS v2.0 on or before Wednesday, October 28, 2026 at 10:30 AM, with opening scheduled for the same day at 11:00 AM. Interested bidders should obtain detailed bidding documents from the ePADS portal. For further information and queries, bidders may contact the Assistant Manager Procurement at LESCO Head Quarter, 22-A Queens Road, Lahore City, Punjab via phone +92-370-499-0342 or email ammm5@lesco.gov.pk.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender, written with AI from the official notice and checked by our quality rules — not part of the official notice. Always confirm details against the original tender document.
LESCO seeks galvanized HT steel structures (45-foot) for transmission line infrastructure in FY2026-27.
This appears to be a standardized procurement of manufactured goods rather than fabrication work—scale likely medium to large given utility-level volumes. Single-stage LCBS methodology suggests straightforward price competition; no pre-qualification complexity indicated. Deadline is tight (10 months from notice date). Supplier must be registered on ePADS and capable of meeting utility-grade galvanization standards.
Who can bid: Not construction—goods procurement, so PEC registration not required. Bidders must register on ePADS v2.0 portal. Typically, Pakistani suppliers require active NTN and SECP registration (if company). Specific registration restrictions with LESCO or material authority not stated in notice.