Tender Details
Description / Scope of Work
The Lahore Development Authority, UD Wing, is inviting tenders for eleven renovation, addition and alteration projects across Lahore, including church renovations in Babu Sabu and other locations, tuff tile and PCC works at Main Road Nawaz Colony Graveyard, sewerage and tuff tile works at multiple sites, and addition/alteration works at various religious structures. The tender notice covers works valued between approximately 6.6 million and 11.1 million Pakistani rupees per project, with estimated costs and scope details provided for each of the eleven scheduled works. Projects are located at multiple sites across Lahore including Babu Sabu, Nawaz Moor, Apostolic Church Pakistan, Jhandiala Sher Khan Tehsil, Liaquat-ul-Noor Colony, Green Town, Maraka World Life Church, Grace of God Church, Pesraan Light of Jesus Church, Jesus Victory Pentecostal Church, and Mohuilla Ghosuya Gurdwara Church. The tender is being conducted under single-stage-two-envelope procedure as per PPRA Rules 2014 on an item rates basis for firms registered with Pakistan Engineering Council and with valid PEC licenses.
Eligibility requirements mandate that participating firms must hold valid PEC License in Category C-6 and Above with mandatory allocated specialized codes CE-01, CE-10, CE-11(i) and CE-11(vii). Contractors must possess valid registration certificates with the Federal Board of Revenue for income tax and with Punjab Revenue Authority. Average working capital must equal or exceed fifty percent of the estimated cost of work in the last three financial years, supported by duly certified annual audit reports for 2023-26. Bidders must maintain a closing bank balance of at least twenty-five percent of estimated cost for the past three months and provide a bank credit line certificate for twenty-five percent of the estimated work cost. Evidence of completion of at least three similar projects valued at fifty percent or more of the estimated cost within the last five years is required, with detailed performance or completion certificates.
Bidding documents will be available on the Punjab e-Procurement System website immediately upon tender notice publication. Contractors must register on the eP system and submit technical and financial proposals strictly in accordance with PPRA evaluation criteria. The submission deadline is 29 October 2026 at 09:30 am, with tender opening on 29 October 2026 at 10:00 am. Bid security must be submitted digitally through the Punjab eProcurement System as per PPRA regulations 2024. All documents must be submitted online through the designated e-Procurement portal; tender submissions can be accessed exclusively via https://eprocurement.punjab.gov.pk/ViewTender.aspx and response time shall be calculated from the website advertisement publication date.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender, written with AI from the official notice and checked by our quality rules — not part of the official notice. Always confirm details against the original tender document.
Lahore Development Authority is tendering eleven religious and infrastructure renovation projects totalling approximately 98 million rupees across Lahore.
Works span church additions/alterations, sewerage and PCC installations at graveyards and residential areas. The tender requires C-6 PEC category minimum with stringent financial credentials—fifty percent average working capital, twenty-five percent liquid reserves, and bank credit lines. Prior experience documentation for three similar projects at fifty percent cost value is mandatory. Submission is digital-only through Punjab eProcurement System with tight compliance requirements around technical specifications and financial documentation.
Who can bid: Bidders must hold valid PEC License Category C-6 and Above with CE-01, CE-10, CE-11(i), CE-11(vii) codes. Registration required with FBR for income tax and Punjab Revenue Authority. Fifty percent average working capital for past three years, twenty-five percent closing bank balance for past three months, and twenty-five percent bank credit line certificate mandatory. Evidence of three similar completed projects at fifty percent or more of estimated cost in last five years required.