Pakhtunkhwa Energy Development Organization (PEDO) invites sealed bids under Single Stage, One Envelope procedure as per KPPRA rules for three separate works at the 81 MW Malakand-III Hydropower Complex located in Dargai, Malakand district, Khyber Pakhtunkhwa. Lot NO.01 covers procurement, installation, testing and commissioning of a hydraulic barrier at the 81 MW facility with earnest money of 2% of total bid price and completion as per work order. Lot NO.02 involves repair of the power house elevator with installation of a new electronic controller, also requiring 2% earnest money. Lot NO.03 covers procurement of various types of plant and equipment for the complex with similar 2% earnest money requirement. All three lots have submission and opening scheduled for 03-11-2026 with staggered opening times between 10:30 and 11:30 hours at PEDO House in Hayatabad, Peshawar.
Bidders must be registered with the Khyber Pakhtunkhwa Revenue Authority (KPRA) and maintain Active status at the time of bid submission. Registration with the Federal Board of Revenue (FBR) with Active status is mandatory, and bidders must possess an Active Sales Tax Registration Number (STRN) with FBR. All bids must be accompanied by bid security equivalent to 2% of the total bid price in the form of bank draft or CDR in favor of CEO, PEDO, valid for 28 days beyond the bid validity date.
Bidders should download the Bid Solicitation Document (BSD) from the e-PAK Acquisition and Disposal System (e-PADS). Bid submission must occur through e-PADS on or before 03-11-2026 at 10:00 hours. Bids will be opened the same day at the Main Committee Room, PEDO House, Sector 38/B-2, Phase V, Hayatabad, Peshawar, and authorized representatives of bidders are welcome to attend the opening. PEDO reserves the right to reject any or all bids under Rule 47(1) of KPPRA Rules 2014. For further details, contact the Resident Engineer at PEDO House on telephone 0932-331056 or via email at re.mkd3@pedo.pk.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender, written with AI from the official notice and checked by our quality rules — not part of the official notice. Always confirm details against the original tender document.
Three parallel lots for equipment and works at Malakand-III hydropower project: hydraulic barrier installation, power house elevator repair with controller upgrade, and plant equipment procurement.
All require 2% earnest money and completion per work order. Tight submission window (03-11-2026) demands immediate action. Bidders need FBR/KPRA registration and STRN before applying. e-PADS submission required; no physical bid submission option stated. Project appears operational maintenance-focused rather than greenfield construction.
Who can bid: Bidders must hold Active registration with KPRA and FBR as of submission date, plus valid Active STRN with FBR. PEC category not mentioned; typically hydropower equipment procurement requires experience credentials and financial capacity. Notice does not specify PEC minimum category or prior contract value thresholds.