The submission deadline has passed. The page is kept for reference. View active tenders →
Tender Details
Description / Scope of Work
HAZECO invites sealed competitive bids for rehabilitation work of control house building and supply yard at the Gawalmandi Oil & Gas Distribution Station (GDS) in Islamabad, Khyber Pakhtunkhwa province. The project, referenced as NCB-04-05-06/2026-27, encompasses structural repairs, construction of watch tower enclosure, renovation of control house building and sewerage and solid drainage enclosure for the facility, with an estimated cost of PKR 13,291,538.96. The scope includes comprehensive rehabilitation aimed at restoring critical operational infrastructure at this strategic distribution station serving the region. Work shall be executed in accordance with PPRA regulations and standards set by the Public Procurement Regulatory Authority, following the Single-Stage Two-Envelope Competitive Bidding (SCB) methodology for transparency and fairness.
Eligibility is open to contractors registered with Pakistan Engineering Council (PEC) for the 2026-27 financial year, with demonstrated experience in similar rehabilitation and construction projects. Bidders must submit complete documentation including PPRA registration, PEC certificate, and financial resources proof such as bank statements showing liquid funds or government-issued enterprise certifications. The bidder shall possess a clean track record with less than fifty percent (50%) default history of the contract value, along with relevant experience in comparable work orders, contract agreements, and compliance certificates. Bidders are required to hold independent financial certification from the Institute of Chartered Accountants of Pakistan (ICAP) for the last five years.
Bid documents are available from the Project Director at HAZECO head office in Islamabad, with a submission deadline of 10 August 2026. The technical and financial bid submission is scheduled to close on that date, with bid opening planned for 11 August 2026 at 11:30 hours. Bidders must submit sealed bids at the office of the Project Director (GSC), HAZECO, Islamabad, following all prescribed procedures outlined in the tender notice. Contact details and further information regarding participation requirements and submission procedures are available through official HAZECO channels.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
HAZECO seeks rehabilitation of control house building and supply yard at Gawalmandi GDS in Islamabad—structural repairs, watch tower enclosure, drainage work.
Project value PKR 13.29M suggests medium-scale work executable within standard timelines (Aug 2026 deadline allows 6+ months). Notable: ICAP financial certification requirement for prior 5 years is stringent; this screens for established firms with audited accounts. One-off infrastructure rehab rather than recurring maintenance.
Who can bid: Must hold active PEC registration (2026-27). Require PPRA registration, ICAP audited financials (5 years), bank statements/enterprise certification, and <50% historical default rate. Typically also need NTN, valid SECP registration if incorporated, and performance track record in similar rehabilitation projects.