Tender Details
Description / Scope of Work
Hazara Electric Supply Company (HAZECO) invites bids for rehabilitation work of the control house building and switch yard at the 66 KV Grid Station located in Haripur, Abbottabad District, Hazara Division, Khyber Pakhtunkhwa. This is a national-level procurement conducted under a single stage, one-envelope bidding process. The project is being managed by the Project Director of Grid System Construction (GSC) at the 66 KV Grid Station on Murre Road, Abbottabad. The scope encompasses structural rehabilitation, maintenance, and upgrades to critical electrical infrastructure serving the regional power distribution network.
Eligibility criteria require bidders to possess relevant construction experience and appropriate Pakistan Engineering Council (PEC) registration in the applicable category for electrical and civil works. Bidders must be registered with the Securities and Exchange Commission of Pakistan (SECP) or the National Tax Number (NTN) authority. A bid securing declaration is mandatory; specific bid security amounts and performance guarantee requirements are detailed in the bid data sheet and contract forms appended to this document.
Interested bidders should obtain the complete bidding documents from the Project Director GSC office at 66 KV Grid Station, Murre Road, Abbottabad, Abbottabad District, Khyber Pakhtunkhwa, or contact the office via phone at +92-370-134-0387 or email at manager.grid.system.construction@hazeco.com.pk. Sealed bids must be submitted by the closing date specified in the tender notice. Bid opening will follow immediately thereafter at the same location. The tender document includes detailed scope of work, bill of quantities, price schedules, general and special conditions of contract, procurement forms, and all required contractual templates.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
This is a rehabilitation project for electrical infrastructure at a 66 KV grid station in Abbottabad. The work scope involves control house and switch yard rehabilitation—suggesting structural, electrical, and equipment upgrade components rather than new construction. The single-stage bidding process indicates straightforward evaluation without technical pre-qualification rounds. Typical timelines for such rehabilitation projects range from six to eighteen months. The document is dated July 2026 and closing is August 2026, indicating a compressed mobilisation window; contractors should verify their team availability and local resource access before bidding.
Who can bid: Bidders typically require PEC registration in relevant electrical and civil engineering categories, SECP or NTN registration for tax compliance, and documented experience with high-voltage electrical infrastructure rehabilitation. Experience with similar 66 kV or higher voltage station works is normally expected. Local contractor preference or regional suitability may apply; confirmation should be sought from the procuring entity.