Tender Details
Description / Scope of Work
The Public Health Engineering Division DIKhan invites electronic bids from eligible government registered contractors on a single-stage double envelope procedure for the construction of drinking water supply and sanitation schemes in District DIKhan, Khyber Pakhtunkhwa. The project encompasses levelling and grading of road berms, fixing of touch titles, construction of secondary main holes and drains, sub-head road berms with secondary drains, and secondary main holes for sewers. The estimated cost of the project is 52.916 million rupees, with a bid security stamp duty of 1.098 million rupees required. This infrastructure development initiative aims to improve water and sanitation services across the district. The work is to be completed as per the specified work order timeline. Eligible government registered contractors meeting KPPRA criteria and possessing valid PEC registration in the relevant category are invited to participate in this competitive bidding process for infrastructure development in KPK province.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
A single-phase infrastructure tender for water and sanitation construction in DIKhan district valued at approximately 53 million rupees. The project combines multiple work streams (water supply, sanitation, road berms, drainage systems) into one contract, suggesting moderate complexity and extended execution timeline. Bidders must be government-registered with valid PEC credentials. The closing date is 26 August 2026, providing reasonable preparation time for documentation and site assessment.
Who can bid: Eligible bidders must be registered with the government and hold current PEC (Pakistan Engineering Council) registration in the relevant construction category. Contractors must comply with KPPRA rules. Typically, such contracts also require active NTN registration, no adverse record with PPRA, and evidence of prior similar project experience at comparable scale.