Tender Details
Description / Scope of Work
National Bank of Pakistan invites bids for the supply and installation of a solar hybrid power system with distribution board panel and requisite cabling works at multiple NBP branches and the regional office building in Peshawar. This is a national competitive procurement for goods under single-stage one-envelope bidding procedure. The project encompasses the complete delivery and installation of solar hybrid power systems including DB panels and associated electrical cabling infrastructure across several banking locations, representing a significant energy sustainability initiative for the bank's Peshawar operations. The procurement is advertised for national bidders capable of delivering integrated solar power solutions with professional installation services.
Bidders must meet specified eligibility criteria including relevant registration, financial capacity, and technical capability to execute solar power system projects of this scope. A bid securing declaration is required as per the standard bidding document terms. Bidders should demonstrate experience with similar hybrid power system installations and possess necessary technical qualifications and licenses for electrical and renewable energy works. The bank will evaluate all submissions based on the documented evaluation criteria and technical specifications provided in the tender documents.
Interested bidders may obtain the complete bidding documents from the Tender and Procurement Division at NBP Head Office, Karachi. Bids must be submitted in a single sealed envelope to the Office of the Departmental Head Tender, Procurement Division, LCMG, 3rd Floor Right Wing, NBP Head Office Building Karachi by 11 August 2026. For further information, contact the Procurement Division by phone at +92-213-890-2582 or via email at teemar@nbp.com.pk.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
National Bank of Pakistan seeks integrated solar hybrid power system supply and installation across multiple Peshawar branches and a regional office.
This is a goods procurement with installation services component. The scope includes solar panels, hybrid power equipment, distribution boards, and electrical cabling—a capital project likely in the medium-to-large range. The August 2026 deadline suggests advance planning. Bidders should verify exact site counts and power capacity specifications in the detailed technical annexure before costing. This is a one-off project rather than recurring service.
Who can bid: Specific eligibility requirements are referenced in the bid data sheet but not detailed in this cover document. Typically, solar power system suppliers must hold relevant SECP/NTN registration, demonstrate financial solvency with audited accounts, possess technical certifications for electrical and renewable energy work, and provide evidence of similar completed projects. PEC registration is typically required for installation works in Pakistan.