Tender Details
Description / Scope of Work
Punjab Industrial Estates Development and Management Company (PIEDMC) invites sealed bids for the rehabilitation of aquafer wells at Sundar Industrial Estate in Punjab. The project aims to restore and enhance water supply infrastructure at the estate through comprehensive well rehabilitation works. The tender reference number is PIE/P&C/AW/BOM-SIE/26/41, and bidding documents are available as Volume-I, issued in September 2026. The scope includes technical interventions to improve aquafer well functionality and capacity at the specified industrial estate location.
Bidders must meet the eligibility criteria as outlined in the bidding documents, including relevant technical qualifications, registration requirements, and financial capacity to undertake the rehabilitation works. Standard bid security and performance guarantees will be required as per contract terms. Bidders should demonstrate prior experience in similar water infrastructure rehabilitation projects and possess necessary approvals from relevant authorities.
Complete bidding documents including technical specifications, conditions of contract, standard forms, and bid schedules are contained in Volume-I. Interested bidders must obtain the full documentation and submit sealed bids according to the instructions provided in the bidding data section. The bid opening and evaluation process will follow procedures outlined in the conditions of contract, with contact details and submission guidelines available in the formal bidding documentation.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
PIEDMC is procuring rehabilitation services for aquafer wells at Sundar Industrial Estate—a focused water infrastructure project at an operating industrial complex.
The scale appears medium, involving technical well rehabilitation work rather than new drilling or large-scale construction. The tender is structured in formal volumes with comprehensive technical specifications, suggesting a professionally managed procurement. Bidders should note this requires specialized hydrogeological or water-well engineering expertise; general construction experience alone may be insufficient.
Who can bid: Typically, contractors must possess relevant engineering registration (PEC for civil/water engineering), valid NTN and SECP registration, audited financial statements, and prior experience with similar aquafer or well rehabilitation projects. The notice does not explicitly state specific category thresholds, so standard requirements for water infrastructure rehabilitation contracts should be confirmed from the full bidding documents.