Open Tender Lift Elevator Travelator

Electrical Modernization of Orona Gearless Elevator by Bahria University

🏛 Bahria University, H-11 Campus, Islamabad
📍 Federal
📅 Closes: 28 Sep 2026
🔖 Ref: BUI-H-11/2026/Lift/Upgradation
⬇ Download Tender

Tender Details

Issuing Organisation Bahria University, H-11 Campus, Islamabad
Location Federal
Category Lift Elevator Travelator
Published 14 Sep 2026
Closing Date 28 Sep 2026
Reference BUI-H-11/2026/Lift/Upgradation

Description / Scope of Work

Bahria University, H-11 Campus in Islamabad invites sealed technical and financial quotations from experienced elevator engineering firms for controller migration and electrical modernization of one existing Orona passenger gearless elevator. The scope encompasses detailed site survey and compatibility assessment, dismantling of obsolete electrical control equipment, supply and installation of Monarch NICE3000+ integrated control system, integration of the existing permanent-magnet gearless machine and encoder, replacement or integration of VVVF door drive and related components, comprehensive verification of safety systems including door locks, emergency stops and governor interfaces, and complete testing, commissioning and load testing with operator training and handover documentation. The project must retain the existing gearless machine and coated suspension ropes subject to successful verification. Completion is required within ten to fifteen working days from commencement.

Bidders must demonstrate mandatory qualifications including valid Pakistani business registration, NTN and sales-tax compliance, a minimum of eight years continuous elevator engineering operations in Pakistan, a portfolio of at least five hundred elevators or escalators installed or modernized, at least five controller-migration projects completed in the last five years including two gearless-machine integrations, and in-house technical expertise with proven Monarch NICE3000+ programming and diagnostic capability. Firms must operate a permanent service office in Islamabad or Rawalpindi with operational support in at least four additional Pakistani cities, maintain a minimum of two engineers and six elevator technicians, and commit to remote response within two hours and onsite emergency attendance within four hours in Islamabad. A mandatory site-visit certificate signed by the University representative and an eighteen-month parts and workmanship warranty plus six months preventive maintenance without labour charges are required.

Bidders must submit separate sealed technical quotations without pricing and sealed financial quotations within a single outer envelope. The quotation closing date is 30 September 2026, with mandatory site visits scheduled for 17 September 2026. Bid validity is sixty calendar days from submission. The University will select the most advantageous technically responsive quotation and is not bound to accept the lowest price. Documentary evidence for all mandatory requirements must accompany the bid; failure to submit such evidence renders the quotation technically non-responsive.

🔒
Subscribe to read 2 more paragraphs of scope, requirements and submission detail
Full scope, eligibility, bid security, deadlines and downloadable tender documents — plus daily alerts for matching tenders. From PKR 3,000/month.
Unlock →

For Bidders: Our Analysis PAKISTANTENDER INSIGHT

Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.

This is a specialized controller-migration project for a single Orona gearless elevator at a federal university in Islamabad.

The scope requires proven Monarch NICE3000+ expertise and prior gearless-machine integration experience—significant qualification barriers eliminate most generalist contractors. The tight ten to fifteen working-day timeline and mandatory site visit on 17 September demand immediate resource commitment. This is a one-off modernization contract, not recurring maintenance, with fixed completion requirements and comprehensive testing protocols.

Who can bid: Bidders must be registered with SECP/FBR, hold valid NTN and sales-tax registration, and demonstrate eight years continuous elevator operations in Pakistan. A minimum portfolio of five hundred installed units, five prior controller migrations including two gearless integrations, and in-house Monarch NICE3000+ expertise are mandatory. Permanent Islamabad/Rawalpindi presence and verified technical staffing (two engineers, six technicians) are required. Failure to submit documentary evidence for any mandatory criterion results in technical non-responsiveness.

🔒
Subscribe to read our full eligibility read and bidder analysis
Full scope, eligibility, bid security, deadlines and downloadable tender documents — plus daily alerts for matching tenders. From PKR 3,000/month.
Unlock →
KEY FACTS FROM THE NOTICE
Pre-bid meetingMandatory site visit on 17-09-2026 at Bahria University H-11 Campus, Islamabad
Estimated scaleSmall
Contract typeOne-off
Documents required Business registration certificate · NTN certificate · Sales-tax registration · Portfolio/project records of 500+ units · Five controller-migration projects with two gearless integrations · Staff qualifications and Monarch NICE3000+ credentials · Permanent service office proof · Technical manpower details
HA Analysis by PakistanTender Research · Reviewed by Hamza Ali, Cactus Consulting (SMC Pvt) Ltd · How we verify tenders · Report an error

Explore More Tenders

Get Full Tender Documents

Subscribe to download tender documents, track deadlines, and receive daily alerts for tenders in your industry.

Register Now — From PKR 3,000/mo Ask on WhatsApp
Chat with us
⬇ Download Tender