Tender Details
Description / Scope of Work
This tender invites bids for the construction of a 2x3 duct line with manholes extending from G-8/3 to PIMS Cancer Hospital (Part III) in Islamabad, to be executed under deposit head by the Construction Division of IESCO Islamabad. The project is a national-level works contract advertised under single-stage, one-envelope bidding procedure. Interested contractors must obtain the standard bidding document which contains detailed specifications, scope of work, price schedules, and general and special conditions of contract from the IESCO Village Electrification Cell office located at the New Building adjacent to Rawal Grid Station in Islamabad.
Bidders must meet specified eligibility criteria including financial capacity and net worth requirements as detailed in the procurement forms. A bid security declaration is mandatory, and bidders are required to demonstrate relevant experience and technical capability for underground duct line construction with proper finishing. The contract will be governed by standard and special conditions prescribed in the bidding document, and a performance guarantee will be required from the successful bidder upon contract award.
Bid documents are available for download or collection from the office of the Additional Director (VEC) at the address provided. Sealed bids must be submitted by the closing date of October 5, 2026. For further information, contact IESCO Village Electrification Cell by phone at +92-319-599-1410 or email at veciesco@yahoo.com. Tender opening and evaluation will proceed according to the schedule specified in the bid data sheet.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
This is a Part III continuation of an Islamabad underground duct line project for IESCO connecting to PIMS Cancer Hospital.
The scope appears modest (duct and manhole construction) but requires underground infrastructure expertise and proper utility coordination. The deposit-funded structure suggests government budget backing. Bidders should verify local experience with telecom or utility duct installations in Islamabad and confirm compliance with financial capacity thresholds outlined in the eligibility forms before committing resources to bid preparation.
Who can bid: Bidders typically require PEC registration (construction category), valid NTN, and documented net worth meeting the thresholds specified in the Financial Capacity and Net Worth Evaluation Form included in the bidding document. Contractors must demonstrate prior experience with similar underground duct line and manhole construction projects.