The Khan Khwar Hydel Power Station, Besham, under WAPDA (Water and Power Development Authority), is inviting sealed bids from eligible contractors for the construction of a car parking shed at Khan Khwar Power House in Besham, Khyber Pakhtunkhwa. This is a civil works procurement with reserved funds allocated under the FY 2026-27 budget. The project is located in Shangla District within the Malakand Division of KP Province. The tender employs a Single Stage-One Envelope bidding process using the Least Cost Based Selection (LCBS) technique in accordance with the Public Procurement Rules, 2004. This is a national-level procurement open to qualified bidders registered on the EPADS v2.0 platform.
Eligible bidders must be registered on the e-Pak Acquisition and Disposal System (EPADS v2.0) to participate. All bids must be accompanied by bid security in the form of a Pay Order, Banker's Cheque, Call Deposit, or Demand Draft, or alternatively a bid securing declaration in the format specified in the bidding documents. Bidders are expected to possess appropriate construction licenses and registration credentials as per standard requirements for civil works contracts under WAPDA and public procurement rules.
Detailed bidding documents, including specifications, terms, conditions, and pricing schedules, are available on EPADS at https://epads.gov.pk/opportunities/federal/procurements/117571. Sealed e-bids must be submitted through EPADS v2.0 on or before the specified closing date. For inquiries or technical clarification, bidders may contact the Resident Engineer's office at Khan Khwar Power Station via email at rekhankhwar.proc@gmail.com or by phone at +92-333-580-6800.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
Small-to-medium civil works contract for a parking shed structure at a hydroelectric facility.
Closing date is October 3, 2026—approximately three months from publication. Uses LCBS (lowest cost wins), so bid pricing discipline is critical. WAPDA contract execution may involve compliance with power sector norms and site-specific conditions typical of power station projects. Bidder must be EPADS-registered and capable of surety arrangement.
Who can bid: Bidders must be registered on EPADS v2.0. Typically, construction contractors require valid PEC (Pakistan Engineering Council) registration for the relevant category, active NTN with FBR, and SECP registration if private limited. WAPDA procurement follows Public Procurement Rules 2004; no entity debarred under those rules may bid.