SEPCO Sukkur, operating under the Ministry of Energy (Government of Pakistan), invites sealed bids for the procurement, supply, installation, testing and commissioning of an Asset Performance Management System (APMS) on a turnkey basis. The project scope is defined by PPMC specification No. DS-01:2026 and covers complete delivery of hardware, software, integration and operational readiness. This is a single-stage, one-envelope national competitive bidding (NCB) process for goods with corrigendum number CORR-P111760-001 dated September 18, 2026. The system will serve SEPCO's asset management operations in Sukkur, Sindh Province.
Bidders must meet eligibility criteria including financial capacity, technical experience in similar system implementations, and compliance with Pakistan's regulatory requirements. A bid security mechanism is required as per the Bid Data Sheet. All prospective suppliers should review the complete technical specifications, general and special conditions of contract, and evaluation criteria detailed in sections 30 onwards of this document. The procurement follows standard bidding practices with emphasis on turnkey delivery capability and post-implementation support.
Bid documents are available from the PMU office at SEPCO Sukkur, Al-Sehra Building, Minara Road near Session Court, Sukkur. Interested bidders may contact Chief Engineer (Development) Abdul Ghani at telephone +92-300-931-6311 or email abdul.ghani@sepco.com.pk for clarification or document collection. Sealed bids must be submitted to the designated address with opening scheduled following the deadline specified in the Bid Data Sheet. Late submissions will not be accepted.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
SEPCO Sukkur seeks a complete Asset Performance Management System including design, supply, installation, testing and commissioning under turnkey contract.
This appears to be a moderately large procurement for an electric utility's core asset visibility and optimization. The initiation date is September 18, 2026 with closing October 22, 2026—a five-week bidding window. Bidders must demonstrate prior APMS or comparable management software implementations and financial stability. The single-stage envelope process indicates technical and commercial proposals are evaluated together; no separate pre-qualification. Turnkey delivery suggests system integration and go-live support are critical success factors.
Who can bid: The notice does not specify PEC category or detailed eligibility thresholds. Typically, APMS procurement requires suppliers to be registered with SECP or NTN, hold relevant software/systems integration certifications, and demonstrate prior relevant contracts. Experience with utility-scale asset management or ERP implementations is normally expected. Local representation or partnership with authorized distributors may be preferred.