Description / Scope of Work
Daanish University Trust, Islamabad, invites bids for the construction of a Pre-Engineered Building (PEB) for an Industry Hub facility. This is a national single-stage two-envelope procurement for works comprising grey structure foundation works, PEB steel frame assembly, interior finishing, electrical installation, plumbing systems, and a Variable Refrigerant Flow (VRF) HVAC system. The project encompasses mobilization and site establishment, temporary utilities, quality assurance testing, debris clearance, comprehensive supervision and coordination, defects liability and maintenance obligations, and full site documentation. The scope includes structural works, mechanical and electrical systems integration, and finishing trades across the complete facility in Islamabad, Federal Territory.
Eligible bidders must meet specified criteria regarding financial capacity, past construction experience, and resource availability. The bidding process requires submission in two envelopes: one containing technical and eligibility documents, and a second containing the financial proposal. Bidders must provide performance guarantees, bid securing declarations, and supporting documentation including evidence of past similar projects, financial statements, organizational capacity, and compliance certifications. A Defects Liability and Maintenance period applies following completion.
Bid documents are obtainable from Daanish University Trust, Section Officer, Room 227, 2nd Floor, D-Block, Pakistan Secretariat, Islamabad Capital Territory, by contacting +92-321-511-1688 or emailing Procurements@daanish.edu.pk. Bids must be submitted by the closing date of October 5, 2026. Technical bid opening will occur on the specified date, with financial bids opened only for technically qualified bidders. The contract form, general and special conditions, evaluation criteria, and detailed specifications are provided in the accompanying standard bidding document.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
This is a complete PEB construction contract for an institutional academic facility, spanning structural steelwork, MEP systems, and interior finishing.
The scope is substantial and multi-disciplinary, requiring integration of civil, structural, mechanical, and electrical trades. Bidders face a tight timeline from publication to closure (approximately 15 days), limiting preparation and site investigation opportunity. The two-envelope format and performance guarantee requirements indicate a formally managed procurement seeking financially stable, experienced contractors with demonstrated track record on similar industrial or institutional buildings.
Who can bid: Construction contractors typically require PEC (Pakistan Engineering Council) registration in appropriate category, NTN registration, and evidence of past relevant experience on pre-engineered building or industrial structures projects. The notice specifies eligibility criteria and financial capacity thresholds; bidders must demonstrate sufficient turnover, net worth, and completed similar contracts. Non-performance history and litigation records will be evaluated.