Open Tender Scrap

Disposal of Scrap Material by MEPCO, Multan

🏛 Office of Director Procurement Distribution, Multan Electric Power Company (MEPCO)
📍 Punjab
📅 Closes: 8 Oct 2026
🔖 Ref: Tender No. 125/2026-27
⬇ Download Tender

Tender Details

Issuing Organisation Office of Director Procurement Distribution, Multan Electric Power Company (MEPCO)
Location Punjab
Category Scrap
Published 22 Sep 2026
Closing Date 8 Oct 2026
Reference Tender No. 125/2026-27

Description / Scope of Work

Multan Electric Power Company (MEPCO) invites bids for the disposal of scrap material under Tender No. 125/2026-27. The tender is issued by the Office of Director Procurement Distribution at MEPCO Headquarters on Khanewal Road, Multan City, Multan District, Punjab. This is a lot-based disposal contract where the successful bidder will be responsible for lifting and removing allocated scrap material from MEPCO stores. The contract requires 100 percent advance payment in addition to bid security, with completion of material lifting within 21 working days from the date of the release order. MEPCO reserves the right to reject any proposal and award to the highest per-unit rate bidder without taxes. The bidder must comply with all safety standards and provide necessary personal protective equipment to workers engaged in the lifting operation.

Eligibility criteria require bidders to hold either NADRA citizenship (CNIC/NICOP), FBR registration (NTN), or FBR registration (GSTN). The bid must remain valid for 120 days from the date of opening, and the interested firm must not be blacklisted or debarred by any organization in Pakistan. Bid security as per the tender advertisement conditions must be submitted from a scheduled bank of Pakistan in favor of the Chief Executive Officer MEPCO. The tender is advertised on a lot basis, and MEPCO reserves rights under PPRA Rule-33 regarding proposal rejection.

Bid documents should be obtained from MEPCO's office, and bids must be submitted before the deadline of tender opening time. No price adjustment shall be made for variations in market prices, taxes, duties, or wage changes. The contractor bears full responsibility for lifting costs, transportation, labor, and compliance with applicable taxes and levies. Any mishap to personnel during lifting operations remains the sole responsibility of the contractor. Detailed specifications, lift schedule requirements, gate pass procedures, and conditions of contract are provided in the full tender document available at MEPCO.

🔒
Subscribe to read 2 more paragraphs of scope, requirements and submission detail
Full scope, eligibility, bid security, deadlines and downloadable tender documents — plus daily alerts for matching tenders. From PKR 3,000/month.
Unlock →

For Bidders: Our Analysis PAKISTANTENDER INSIGHT

Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.

MEPCO is disposing scrap material in lots; bidders compete on per-unit rate (highest wins) and must lift/remove allocated stock within 21 days.

Key burden: 100% advance payment required upfront—substantial working capital demand. Safety compliance and PPE provision are contractor responsibilities. Tight 21-day completion window and full cost absorption (transport, labor, taxes) make this suitable for experienced scrap handlers with fleet access and liquid reserves. One-off transaction, not recurring.

Who can bid: Bidders must hold CNIC/NICOP (NADRA), NTN, or GSTN (FBR registration). Must not be blacklisted/debarred in Pakistan. Typically, sole proprietors require CNIC + NTN; firms need SECP registration + NTN. Bid valid 120 days; security from scheduled bank required.

🔒
Subscribe to read our full eligibility read and bidder analysis
Full scope, eligibility, bid security, deadlines and downloadable tender documents — plus daily alerts for matching tenders. From PKR 3,000/month.
Unlock →
KEY FACTS FROM THE NOTICE
Bid securityas per tender advertisement conditions
Estimated scaleMedium
Contract typeOne-off
Documents required Bid documents (obtained from MEPCO office) · Full tender document (specifications, lift schedule, gate pass procedures, contract conditions) · Bid security from scheduled bank of Pakistan
HA Analysis by PakistanTender Research · Reviewed by Hamza Ali, Cactus Consulting (SMC Pvt) Ltd · How we verify tenders · Report an error

Explore More Tenders

Get Full Tender Documents

Subscribe to download tender documents, track deadlines, and receive daily alerts for tenders in your industry.

Register Now — From PKR 3,000/mo Ask on WhatsApp
Chat with us
⬇ Download Tender