Powered by Cactus Consulting (SMC Pvt) Ltd
Open Tender Irrigation, Canal, River

Flood Bund Construction on DFG Nullah Left Side, Lehri Post to Kingra Bridge, Punjab

🏛 Irrigation Department
📍 Punjab
📅 Closes: 10 Aug 2026
⬇ Download Tender Documents — From PKR 3,000/mo

Tender Details

Issuing Organisation Irrigation Department
Location Punjab
Category Irrigation, Canal, River
Published 24 Jul 2026
Closing Date 10 Aug 2026

Description / Scope of Work

This tender invites bids for the construction of a flood bund on the left side of DFG Nullah from Lehri Post to upstream of Kingra Bridge in Punjab province. The project has an estimated cost of Rs. 1,353.110 million with earnest money of Rs. 67.500 million. The work scope includes jungle clearance and removal within 100 feet, earthwork in excavation of drains and irrigation channels through excavators and drag lines in all soil conditions, borrowpit excavation with undressed lead, transportation of earth materials at various distances, dressing and levelling of earthwork to designed sections, and supply and dumping of stone or boulder materials at site. The contract duration is set until 30 June 2027, providing approximately ten months for project completion. This is a significant civil infrastructure project aimed at flood protection and water management in the region.

For Bidders: Our Analysis PAKISTANTENDER INSIGHT

Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.

Large-scale flood defence infrastructure project valued at Rs. 1.35 billion. Bidders should note the earnest money requirement of Rs. 67.5 million indicates substantial financial capacity expected. Work involves heavy earthmoving, excavation across multiple soil conditions, and material transportation over extended distances. The ten-month completion window is reasonable for this scope, but mobilization must begin immediately post-award. Bidders with experience in irrigation channel and embankment construction will be best positioned.

Who can bid: Typically, bidders for such construction projects must be registered with PEC (Pakistan Engineering Council) in appropriate category, hold valid NTN and GST registration, and demonstrate prior experience with similar hydraulic infrastructure works. The notice does not explicitly state these requirements.

KEY FACTS FROM THE NOTICE
Bid securityRs. 67.500 Million
Estimated scaleLarge
Contract typeOne-off
HA Analysis by PakistanTender Research · Reviewed by Hamza Ali, Cactus Consulting (SMC Pvt) Ltd · How we verify tenders · Report an error

Get Full Tender Documents

Subscribe to download tender documents, track deadlines, and receive daily alerts for tenders in your industry.

Register Now — From PKR 3,000/mo Ask on WhatsApp
Chat with us
⬇ Download Tender Documents — from PKR 3,000/mo