Description / Scope of Work
Public Sector Hospital, Peshawar, located in the University Campus in Peshawar, KPK, is inviting sealed bids for the procurement of Split and Floor Standing DC Inverter Air Conditioning units with latest technology. The tender encompasses thirteen 1.5 Ton Split AC units with DC inverter technology, seven 2 Ton Floor Standing DC Inverter AC units, and fifty meters of extra copper piping for split DC inverters. All units shall be supplied with standard pipes, cables, rawl bolts, outdoor brackets and complete installation by manufacturers including Gree, Kenwood, Haier or equivalent makes. This is a straightforward equipment procurement for the hospital's climate control infrastructure improvement.
Bidding shall be conducted through Single Stage One Envelope procedure with bid validity of ninety days minimum. Eligible bidders must submit a 5 percent Earnest Money deposit as bid security in the form of a Pay Order/Demand Draft drawn in favor of Senior Accounts Officer, IRNUM (FTN: 9015600-5). Bidding documents can be obtained from the office of the undersigned during official working hours from 09:00 AM to 01:30 PM, Monday through Friday, against a non-refundable tender fee of PKR 2,000.
Bidding documents must be obtained by 30 September 2026 at 11:00 AM (Wednesday) and submitted on the same date by 11:30 AM (Wednesday) in the presence of participating firms/companies. Bids will be opened on the scheduled submission date at 11:30 AM. Interested parties should contact the PR Administrator, Public Sector Hospital, PO Box 1450, University Campus, Peshawar (PABX: 091-9222154-58) for further information and clarification.
For Bidders: Our Analysis PAKISTANTENDER INSIGHT
Independent analysis by PakistanTender — not part of the official notice. Always confirm details against the original tender document.
The hospital seeks twenty AC units (mix of 1.5T and 2T) plus fifty meters of copper piping—a moderate-value equipment supply contract without installation complexity since manufacturers provide turnkey setup.
Notably tight timeline: bidders have roughly nine days from notice publication to document procurement and bid submission. Preferred makes (Gree, Kenwood, Haier) are well-established; equivalents acceptable. This appears a one-off procurement rather than framework, but the hospital's scale suggests potential for future repeat orders if supplier performs well.
Who can bid: The notice does not explicitly state registration or license requirements. Bidders typically must hold NTN and be registered with SECP if a company, or hold NTN if sole proprietor. Suppliers of air conditioning equipment typically require PEC-G category (HVAC/mechanical) or equivalent trade registration. Authorized dealers of approved makes (Gree, Kenwood, Haier) would be preferred.